Search the record

Every word spoken in the Dáil and every parliamentary question asked, matched on word forms as well as exact spelling, so "housing" also finds "houses".

Narrow it down: a TD or a date range
Clear

25+ in debates · 25+ in questions

In debates

Flexible Work and Commuter Delays: Motion [Private Members]
Jerry Buttimer 21 Jan 2026
delete all words after "Dáil Éireann" and substitute the following: "notes that: — the Government is committed to the delivery of major public transport projects, as evidenced by last year's review of the National Development Plan (NDP) allocation of €24.3 billion to transport projects from … Plan for Transport 2026-2030 involves a funding ratio of at least 2:1 in favour of new public transport over new roads projects, and for the next five years there will be approximately €3.3 billion allocated towards new roads investment and, at a minimum, approximately €7 billion
Infrastructure Plan: Statements
Jack Chambers 28 Jan 2026
Government’s work to accelerate infrastructure delivery, and to discuss my Department’s role in the management and delivery of capital projects and programmes. In particular, I will outline some of the recent and ongoing developments in my Department, as we implement the actions contained in the accelerating … multifaceted and interconnected challenges the Government faces in infrastructure deficits and the need to prioritise investment in major housing, water, energy and transport projects. In the programme for Government, published one year ago, we made five key commitments for infrastructure delivery. They were: to create a Cabinet committee
Water: Statements
authorities, the Environmental Protection Agency, Inland Fisheries Ireland and directly by my Department. This will include the development of specific evidence-based targeted programmes to drive water quality improvement. First, the farming for water European investment partnership, EIP, was launched in March 2024. The aim of this partnership … implementation of supplementary measures on farmlands where agricultural activities are impacting water quality. Second, a scheme which will fund urban nature-based solution projects will be undertaken by local authorities to manage surface water, drainage and rainfall. Third, the national river barrier mitigation programme will fund the removal
River Boyne Task Force Bill 2023: Second Stage [Private Members]
Kieran O'Donnell 22 Jan 2026
plan, the Water Action Plan 2024, has been launched and is currently being implemented through a range of public authorities overseen by the programme delivery office in the Department. The water action plan is the principal means through which we are addressing our water quality. Building … that have been selected under the plan for targeted measures. Several priority areas for action are being administered by the local authority waters programme, LAWPRO, and the relevant local authorities with the aim of restoring water quality in the Boyne catchment. The work being undertaken by LAWPRO
Schools Building Projects
Robert Troy 20 Jan 2026
this matter as it gives me, on her behalf, an opportunity to update the House on the current position regarding the school building project for Bunclody Community College, Bunclody, County Wexford. The project referred to by the Deputy is devolved for delivery, as he said, to Waterford … Wexford Education and Training Board. The project brief is to provide an extension to the existing school building, as well as the appropriate refurbishment of the existing buildings to be retained for ongoing educational use. This will cater for a long-term projected enrolment of 550 and provide
School Meals Programme
Neale Richmond 15 Jan 2026
Ellis for raising this matter, which I am taking on behalf of the Minister for Social Protection. The objective of the school meals programme is to provide regular, nutritious food to children to support them in taking full advantage of the education provided. The programme is an important … component of policies to encourage school attendance and extra educational achievement. In the last budget, the hot school meals programme was extended to all remaining primary schools. This means that approximately 3,700 schools and 682,000 children are eligible for school meals. There are 3,200 primary
Schools Building Projects
Robert Troy 20 Jan 2026
Deputy for raising this matter as it gives me the opportunity to update the House on the current position regarding the school building project for Coláiste Daibhéid, Cork. The project referred to by the Deputy was approved to enter the Department's pipeline for a project under … additional school accommodation scheme. The project will provide one multimedia room, one textiles room, one graphics room, one construction room, one technology prep area, one science laboratory, and prep area and one project store. The inclusion of a PE hall or general purpose dining hall depends on site
Public Transport
Jerry Buttimer 20 Jan 2026
raising matters relating to public transport in the House. I am taking this matter on behalf of the Minister for Transport. The DART+ programme comprises five different rail projects in and around the greater Dublin area, extending the existing DART network to Maynooth, M3 Parkway, Hazelhatch and Celbridge … Drogheda and improving current DART services from Dublin city to Greystones. The programme will triple the length of the electrified rail network in the Dublin area and double city centre peak hour capacity from 26,000 passengers per direction to 52,000 in future. DART+ South West will
Schools Building Projects
Hildegarde Naughton 13 Jan 2026
thank Deputy Farrelly for raising this matter and giving me the opportunity to provide an update to the House on the school building project at St. Farnan's Post Primary School in Prosperous, County Kildare. The project brief is to provide a new-build replacement school … long-term projected enrolment of 1,000 pupils, including a four-classroom special educational needs base. The delivery of this project has been devolved to Kildare Wicklow Education and Training Board, KWETB. The project is in the final stages of stage 2B, which is the post-planning process
Infrastructure Plan: Statements
Frankie Feighan 28 Jan 2026
thank Members for their constructive and insightful contribution to the debate, which affirms the importance of public investment in the delivery of capital projects and programmes and the urgent need to remove the barriers to infrastructure development. What has been made very clear is that, collectively, we know … resilience and achieving value for money for the Exchequer. That is why the five key commitments for infrastructure delivery outlined in the programme for Government have been implemented. As Members know, the review of the national development plan set out annual sectoral allocations for the period
Water: Statements
James Browne 21 Jan 2026
matter of priority. In terms of national development plan, NDP, funding, Uisce Éireann has allocated €1.7 billion for a new additional growth programme that will support accelerated housing delivery. Uisce Éireann has identified 72 strategic settlements through reviews of the national planning framework; regional spatial and economic strategies … possible with local authorities and local planning authorities to inform local planning decisions over the coming years. In addition to this accelerated growth programme, Uisce Éireann is embarking on some of the largest infrastructure projects ever undertaken in Ireland to meet our future growth and societal needs
Further and Higher Education
Marian Harkin 28 Jan 2026
thank the Deputy for raising this matter. The proposal before us, as he said, is not just another bricks-and-mortar project. It is a strategic investment to deliver an integrated further education and training college for Kilkenny which addresses historical infrastructure deficits and drives the reform … enabling infrastructure, will consolidate dispersed provision into a single modern campus and deliver a consistent learner experience across a wide range of programmes. As the Deputy said, it is not ideal that provision has been scattered around 15 different locations. It should not matter where people live. This
Rail Network
Alan Dillon 13 Jan 2026
behalf of the Minister for Transport I thank the Deputy for the opportunity to address the House on this issue tonight. The DART+ programme comprises five different projects in and around the greater Dublin area. It will extend the existing network from the city centre to Maynooth … Parkway, Hazelhatch and Celbridge, and Drogheda, and will improve current DART services from the city centre to Greystones. The programme will triple the length of the electrified network and will double city centre capacity from 26,000 passengers per hour per direction to 52,000 during peak hours
Expenditure Reviews
James Lawless 29 Jan 2026
City of Dublin Education and Training Board, ETB, made reference in its annual accounts to a legacy IT project for SUSI that started in 2015 – before either of us were in this House - but experienced a number of problems and delays. Ultimately, it did not result … successful delivery of a completed system. Although unacceptable, IT projects, unfortunately, can encounter difficulties both in the public and private sectors. It is often the case, having worked in IT many years ago, that IT projects fail. Sometimes, they can be rebuilt or remodelled and other times they
Questions on Policy or Legislation
Simon Harris 29 Jan 2026
list and a significant ramp-up of capital investment. What we saw yesterday was an effort to move forward a further 105 projects. That list consisted of 80 large-scale additional school accommodation projects and 25 further projects to be delivered under the modular accommodation programme. A total … projects were already at tender stage and 35 are projects that have planning permission or are at pre-tender stage. The criteria for identifying projects included projects that were ready to go to construction or to tender in 2026 or 2027; the condition of the school; projects
Departmental Funding
Jim O'Callaghan 27 Jan 2026
thank the Deputy for his question in respect of the Whitechurch addiction support programme. As the Deputy will be aware, there is funding available under the community safety fund. I think I spoke to him about it before in the justice committee. It is funding that is available … that have affected by criminality, and is the proceeds of crime. Since it was launched in 2022, it has supported 127 community safety projects all across Ireland. The fund is now managed by the national office for community safety in my Department that was established last year. From
Public Transport
Aidan Farrelly 20 Jan 2026
well aware of the outrage that met the Minister's announcement regarding the decision to defer the delivery of DART+ South West, a project costed at €1 billion that was set to increase the capacity on rail services running from Hazelhatch and Celbridge, County Kildare, to Dublin from … they could interact with their communities and their capital city. Before Christmas, the Minister performed a bit of a U-turn on a project that has been planned for many years. We have not had a justifiable reason as to why that was the case. The latest press
School Meals Programme
Dessie Ellis 15 Jan 2026
School has provided around 95% of the children to the school since the late 1970s. St. Malachy's became part of the DEIS programme of support for schools in 2005. It is also a trauma-informed school. The school ensures that there is a safe, nurturing and supportive … major psychological effect on them and greatly impacted their education. That is why the school's participation in the school completion programme is so important. The school completion programme provides support for children and young people at risk of early school leaving. Through this programme, St. Malachy
Flexible Work and Commuter Delays: Motion [Private Members]
Ciarán Ahern 21 Jan 2026
been delayed due to supply issues with new battery trains, with a knock-on impact on other planned network improvements; — public transport projects with planning permission are not progressing due to a lack of political will to provide funds, including DART+ South West, now paused at least four … cent in both 2024 and 2025 to meet the sectoral emission ceiling in the first carbon budget, which will not be achieved, with projected reductions of only 1.3 per cent and 2 per cent respectively in those years; recognises that the lack of a right to flexible
Water: Statements
John Cummins 21 Jan 2026
over 70,000 sq. km, with 4,842 water bodies. The Environmental Protection Agency, EPA, oversees and implements the national water quality monitoring programme, which is designed to assess the overall condition of our rivers, lakes, canals, estuaries, coastal waters and groundwaters. The latest EPA report on water … phosphorus concentrations. In accordance with the water framework directive, Ireland has implemented a series of river basin management plans, which are specific programmes of environmental measures to protect and restore water quality. To protect natural waters from the negative impact of human activities, many such activities are controlled
Water: Statements
Tony McCormack 21 Jan 2026
acknowledge the significant work being delivered by the Minister, Deputy Browne, the Minister of State and the accelerated infrastructure programme brought forward by the Minister, Deputy Chambers. That programme is about unlocking funding, removing bottlenecks and clearing whatever is holding up progress on critical infrastructure projects. This work … simple: stop managing the problem - get it fixed and get the work done now. I want to address the Shannon water supply project. This is a vital national project, currently projected to begin in 2028 and conclude in 2032, all going to plan. If our country
Uisce Éireann Infrastructure Delivery, Accountability and Repair Timelines: Motion [Private Members]
John Cummins 14 Jan 2026
operation and control of public water services from local authorities to direct Uisce Éireann responsibility represents one of the largest public sector reform programmes in recent years. It involves numerous facilities around the country and over 3,000 local authority workers, both full- and part-time workers … uplift in housing delivery our country requires. Under the national development plan, Uisce Éireann has allocated €1.7 billion for a new additional growth programme that will support accelerated housing delivery. Uisce Éireann has identified 71 settlements across Ireland for additional investment where the existing capacity of treatment plants
School Accommodation
Hildegarde Naughton 13 Jan 2026
committed to ensuring that there is appropriate accommodation available for all pupils in the wider context and to ensure that each school project on the schools building programme is subject to due diligence required under the Government's infrastructure guidelines. It is a challenging construction environment … right across the education, transport and housing sectors so the Department also has to manage the timing, scope and cost of individual projects to ensure they remain within budgetary parameters for the overall programme. That involves constant reviewing throughout a project's life cycle. As I said
Immigration Policy
Colm Brophy 27 Jan 2026
thank the Deputy. As he will be aware, the humanitarian admissions programme prioritises at-risk individuals, human rights defenders, women's rights activists, LGBTQ+ individuals, judiciary and journalists for admission to Ireland as programme refugees. This is managed within the remit of the Irish refugee protection programme … Department. Over 700 people from Afghanistan have been admitted to Ireland under this programme since its inception in 2021. Under the terms of the scheme the number of admissions available under the 2025 programme was set at 50 and the number of applications received exceeded that
Water: Statements
Louis O'Hara 21 Jan 2026
ground. Funding was announced three years ago for the provision of wastewater infrastructure in Clarinbridge and Craughwell in County Galway. Since then, these projects have been at a standstill. The costs have gone up. Before Christmas, we saw Government TDs welcoming an increase of funding for the project … However, the Government still has not addressed the main barrier to delivering these projects, which is a requirement that Galway County Council provides matched funding of several million euro. If the project goes over budget, the local authority would have to cover the costs. Galway County Council does

In parliamentary questions

John Clendennen Written
13 Jan 2026 · to Taoiseach
Deputy John Clendennen asked the Taoiseach to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name, location, delivery timeframe, original … approved budget, final outturn cost, and delivery body, for each project. [2437/26
John Clendennen Written
13 Jan 2026 · to Foreign
Deputy John Clendennen asked the Minister for Foreign Affairs and Trade to provide a list of the top ten capital or programme projects delivered by her Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project … name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if she will make a statement on the matter. [2429/26
John Clendennen Written
13 Jan 2026 · to Climate
Deputy John Clendennen asked the Minister for Climate, Energy and the Environment to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years that were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost and delivery body, for each project; and if he will make a statement on the matter. [2423/26
John Clendennen Written
13 Jan 2026 · to Defence
Deputy John Clendennen asked the Minister for Defence to provide a list of the top ten capital or programme projects delivered by her Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name, location, delivery … timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if she will make a statement on the matter. [2425/26
John Clendennen Written
13 Jan 2026 · to Transport
Deputy John Clendennen asked the Minister for Transport to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name, location, delivery … timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2438/26
John Clendennen Written
13 Jan 2026 · to Finance
Deputy John Clendennen asked the Tánaiste and Minister for Finance to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name … location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2428/26
John Clendennen Written
13 Jan 2026 · to Public Expenditure
Clendennen asked the Minister for Public Expenditure, Infrastructure, Public Service Reform and Digitalisation to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2434/26
John Clendennen Written
13 Jan 2026 · to Enterprise
Deputy John Clendennen asked the Minister for Enterprise, Tourism and Employment to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project … name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2427/26
John Clendennen Written
13 Jan 2026 · to Education
Deputy John Clendennen asked the Minister for Education and Youth to provide a list of the top ten capital or programme projects delivered by her Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name … location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if she will make a statement on the matter. [2426/26
John Clendennen Written
13 Jan 2026 · to Culture
Deputy John Clendennen asked the Minister for Culture, Communications and Sport to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project … name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2424/26
John Clendennen Written
13 Jan 2026 · to Housing
Deputy John Clendennen asked the Minister for Housing, Local Government and Heritage to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2432/26
John Clendennen Written
13 Jan 2026 · to Social
Deputy John Clendennen asked the Minister for Social Protection to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name, location … delivery timeframe, original approved budget, final outturn cost and delivery body, for each project; and if he will make a statement on the matter. [2436/26
John Clendennen Written
13 Jan 2026 · to Justice
Deputy John Clendennen asked the Minister for Justice, Home Affairs and Migration to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2433/26
John Clendennen Written
13 Jan 2026 · to Agriculture
Deputy John Clendennen asked the Minister for Agriculture, Food and the Marine to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2421/26
John Clendennen Written
13 Jan 2026 · to Children
Deputy John Clendennen asked the Minister for Children, Disability and Equality to provide a list of the top ten capital or programme projects delivered by her Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project … name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if she will make a statement on the matter. [2422/26
John Clendennen Written
13 Jan 2026 · to Health
Deputy John Clendennen asked the Minister for Health to provide a list of the top ten capital or programme projects delivered by her Department or its agencies over the past three years which were completed on time and within the originally approved budget; the project name, location, delivery … timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if she will make a statement on the matter. [2431/26
John Clendennen Written
13 Jan 2026 · to Further and Higher Education
Clendennen asked the Minister for Further and Higher Education, Research, Innovation and Science to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2430/26
John Clendennen Written
13 Jan 2026 · to Rural
John Clendennen asked the Minister for Rural and Community Development and the Gaeltacht to provide a list of the top ten capital or programme projects delivered by his Department or its agencies over the past three years which were completed on time and within the originally approved budget … project name, location, delivery timeframe, original approved budget, final outturn cost, and delivery body, for each project; and if he will make a statement on the matter. [2435/26
John Lahart Written
29 Jan 2026 · to Education
Deputy John Lahart asked the Minister for Education and Youth the current status of the major building project for a primary school (details supplied); if the project is included in the next tranche of projects due to progress to construction; and if she will make a statement
29 Jan 2026 · to Rural
Deputy John Paul O'Shea asked the Minister for Rural and Community Development and the Gaeltacht the funding allocated through the Clár Programme per local authority; the projects funded to date; the amount of funding drawn down per project; the amount of funding remaining to be drawn down
Gary Gannon Written
27 Jan 2026 · to Transport
Deputy Gary Gannon asked the Minister for Transport the details of the projected operational lifespan of the proposed new statutory MetroLink delivery body; the estimated establishment and ongoing costs; the staffing, legal and administrative expenditure; whether it is intended that the body will be wound down following completion … MetroLink project; whether any impact, value-for-money or efficiency assessment has been conducted on the creation of an additional delivery agency; the expected implications for project timelines, delivery efficiency and accountability mechanisms; and if he will make a statement on the matter. [5633/26
Ken O'Flynn Written
27 Jan 2026 · to Transport
Deputy Ken O'Flynn asked the Minister for Transport the current status of the Mallow relief road project, including its position within his Department’s overall national roads programme; and to confirm whether the project remains an active priority of his Department for the lifetime of the current
Ken O'Flynn Written
27 Jan 2026 · to Transport
Flynn asked the Minister for Transport the level of funding allocated to the Mallow relief road to date; to specify the programme phase in which the project currently sits; and to confirm when the next funding decision relevant to the project is scheduled to be made
Cathal Crowe Written
27 Jan 2026 · to Education
Deputy Cathal Crowe asked the Minister for Education and Youth the number of school building projects that have been completed, on a local authority basis since 2020; the funding allocated for same, by county; the breakdown of the total number of projects currently under construction, per county … breakdown of the total number of projects currently in planning and design, per county, since 2020, in tabular form; and if she will make a statement on the matter. [5445/26
Ged Nash Written
27 Jan 2026 · to Education
Deputy Ged Nash asked the Minister for Education and Youth if she is aware of issues surrounding the progress of a school building project in Drogheda (details supplied); the status of the project; the timeline for delivery of the project; and if she will make a statement

Want to see how often it came up over time? Follow “projects or programmes” month by month.